An international consortium led by Oxbow Power Corp. has been selected to develop Costa Rica?s first build-operate-transfer power project, the 27.5 MW Miravalles III geothermal power station in the Guanacaste province of Costa Rica.
An international consortium led by Oxbow Power Corp. has been selected to develop Costa Rica?s first build-operate-transfer power project, the 27.5 MW Miravalles III geothermal power station in the Guanacaste province of Costa Rica.