GSE Systems Inc. has been awarded a (US)$750,000 contract to build a full-scope fossil power plant

GSE Systems Inc. has been awarded a (US)$750,000 contract to build a full-scope fossil power plant simulator for the 500 MW Korea Electric Power Co. Taean Unit 1 power station.

No posts to display