Alstom wins turbine contracts for large wind farms in Brazil

France’s Alstom has signed two contracts with Queiroz Galvao, a leading infrastructure group in Brazil, to deliver, erect and commission turbines at two large wind farms – Caldeirao Grande I and II.

Caldeirao Grande I and II, both located in the northeastern state of Piaui, will generate a total of 400 MW.

The ECO 122 wind turbines will be manufactured at Alstom’s facility in Camacari in Bahia State, and are scheduled for delivery between 2015 and 2017.

For more Renewables news.

For more Latin America news.

No posts to display