The gas turbine generators will be installed in a cogeneration configuration that will produce 180 MW of power for use in the facility, which has a design capacity of 140,000 barrels per day of GTL products including naphtha, kerosene and lubricant base oils. The project marks the first time that Frame 6 units have been deployed with IGCC technology.

Buildings planned to replace the World Trade Center in New York are all to be designed to achieve the US Green Building Council’s ‘Leadership in Energy and Environmental Design’ (LEED) Gold certification requirements, including the installation of 4.8 MWe of fuel cell CHP plant.