Andritz-Hydro wins bid to equip Laotian power plant

Austrian plant engineering group, Andritz-Hydro (WBAG:à‚ ANDR) have successfully bid to equip the 1,285 MW Xaayaburi hydroelectric power plant in Laos.

Hydroelectric power plant
The company will deliver seven Kaplan turbines, each with an output of 175 MW, an additional Kaplan turbine with an output of 68.8 MW, generators and governors, automation systems, and additional equipment.

For more renewables news

à‚  à‚  à‚ 

à‚ 

Share
à‚  à‚  à‚ 

No posts to display