Agreements have been signed to develop a 1017 MW gas fired power plant in Malaysia.
The Penang-based combined cycle plant has seen agreements drawn up between Samsung Engineering and Construction Malaysia and the Malaysian government-owned Tenaga Nasional Bhd.
Scheduled for completion by the end of 2015, it will include the installation of two Siemens SGT-8000H gas turbines.
For more gas power news