Search

Blackburn Meadows - search results

If you're not happy with the results, please do another search.

UK mega-battery plant set to come online

Blackburn Meadows storage facility is set to come online this week. The E.ON run facility in Sheffield is one of the first of a new fleet of industrial-scale battery plants developed to help the UK grid cope with the rapidly growing amount of renewable power.

E.ON begins storage installation at biomass CHP plant

E.ON has begun installing a 10 MW lithium ion battery at its biomass combined heat and power (CHP) plant at Blackburn Meadows near Sheffield.

AECOM to install CHP system in Sheffield, UK

AECOM Technology has announced today that it has been awarded two design-build contracts with a combined value of $64m to upgrade the Blackburn Meadows Wastewater Treatment Plant for Yorkshire Water in Sheffield, United Kingdom.

Biomass CHP plans from E.ON

E.ON has submitted a planning application to build a £60 million (US$120 million) 25 MWe biomass-fired power station at Blackburn Meadows in Sheffield.

à‚£24m awarded for UK heat network investment

The UK government has awarded £24 million for nine heat network infrastructure projects around the country.

E.ON wins ‘milestone’ UK battery storage deal

E.ON has won a contract with UK transmission system operator National Grid to supply a 10 MW battery energy storage system.

EON pulls plug on 150 MW biomass plant in UK

German energy firm E.ON has pulled the plug on plans to develop a 150 MW biomass plant in the UK.

LATEST FEATURE