Cogeneration CHP, Europe, On Site Renewables

Poland’s largest biogas cogeneration plant

The 2.18 MW cogeneration plant will utilize biogas, mainly created from the fermentation of the Gorzelnia Liszkowo factory’s own residual bioethanol production, to generate electricity, hot water and steam, which will then support the factory’s production processes. The project, expected to be commissioned in July 2008, represents Poland’s largest biogas power plant to date.

Foster Wheeler has been awarded a contract for a 70 MWe circulating fluidized-bed (CFB) steam generator by LUKOIL Energy & Gas Romania. The generator will become part of a new CHP plant to be located in LUKOIL’s oil refinery in Ploiesti, Romania.